top of page

Harrison Hospital

This project includes the construction of a 9-story 500,000 square-foot acute care expansion, 4-story 57,000 square-foot specialty center and 5-story parking garage.

​

MTC's scope includes: post-tensioned concrete, reinforced concrete, structural masonry, structural steel, steel bolting, NDT, lateral framing, proprietary anchors, earthwork, asphalt paving and all associated lab testing.

Bellingham

Bellingham Office

3926 Irongate Rd, Ste B

Bellingham, WA

98226

(360) 755-1990

Tukwila

Tukwila Office

4611 S. 134th Place, Suite 240

Tukwila, WA

98168

(360) 755-1990

Burlington

Burlington Office

777 Chrysler Drive

Burlington, WA

98233

(360) 755-1990

Olympia

Olympia Office

2118 Black Lake Blvd. SW

Olympia, WA

98512

(360) 755-1990

Silverdale

Kitsap Office

5451 NW Newberry Hill Rd., Suite 102

Silverdale, WA

98383

(360) 755-1990

© 2018 - Materials Testing & Consulting, Inc.

bottom of page